From: Case study: evaluation of the automation of material handling with mobile robots
Parameters of the system | |
---|---|
AMRs max speed | 0.8 m/s |
Scenario duration | 8 h |
Replication of each scenario | 20 |
Demand for work | Normal distribuition (standard deviation: 11-20% of the mean) |
Warm up | No |
Random streams | Built in on FlexSim |
Loading time | 40 sec |
Unloading time | 40 sec |
Labeling time | 60 sec |